3D Tatami Flock Label Pricing: 7 Factors Behind the Quote

✍️ By: Dave Li
|
📅 Published: Jun 12, 2026
|
🔄 Updated: Oct 18, 2026
|
⏱️ Read time: 19 min

A label quote is not a price list with a volume discount bolted on. It is a set of fixed setup costs, variable material and machine costs, and risk costs that may never appear on the page. That distinction matters in 3D Tatami Flock Label Pricing because a 2 cm² mark with 1 colour can share almost nothing with a 5 cm², 4-colour mark except the factory and the word “label.” The product’s current specification starts with a 1,000-piece MOQ, a 0.8–1.5 mm profile and a 4–15 day production window; those facts are a better starting point than a competitor’s screenshot.

I price production work from the process backward: screens, passes, material, yield, packing and the cost of proving the result. The design and registration rules belong to the pillar article, so this piece stays on cost. Every dollar example below is flagged as arithmetic, not a quote. Your supplier’s screen charge, labour rate and freight lane will differ.

3D Tatami Flock Label Pricing factors shown on a multicolour flocked badge

Key Takeaways

  • The quote has 7 main drivers: setup, area, colour count, base and backing, quantity, finishing and risk.
  • A setup charge is fixed per design or screen; dividing it by 500 pieces creates a different unit cost than dividing it by 2,000 or 5,000.
  • Every additional colour adds a screen, a registration pass and material consumption, so 4 colours are not simply “4 inks” in a pricing model.
  • The product page lists a 1,000-piece MOQ, 4–7 day sampling and 10–15 day bulk production; those windows should be priced as schedule commitments, not free options.
  • Choose Tatami flock when the raised multicolour surface earns its setup and risk. Choose woven for sewn-in permanence, printed for a flat cost-led mark, and silicone when a molded shell is worth the tooling.

What Moves 3D Tatami Flock Label Pricing?

Seven cost groups explain most of a 3D Tatami flock quote: setup, flock area, colour count, base and backing, order quantity, finishing and failure risk. Each group changes a different line.

Cost driverWhat changes itWhat to ask the supplier
SetupScreens, prepress, first-off alignmentIs each screen charged once or per run?
Flock areaSquare centimetres, pile height, cut shapeIs the quote based on the finished label or the carrier sheet?
Colour countNumber of overprint passesWhich colours need a separate screen?
Base and backingFabric, adhesive, anti-migration layerIs the quoted construction specified by name?
QuantitySetup amortisation and machine occupancyWhich quantity breaks actually change the price?
FinishingCutting, packing, individual bags, cartonsWhat is included at the quoted unit price?
RiskSampling, inspection, wash evidence, reworkWhat happens if the first-off fails?

Which costs are fixed before the press runs?

Artwork preparation, screen making and the first registration setup are fixed before the first saleable label exists. They are incurred once for a design, not once per label. I separate those charges from the run cost because buyers otherwise compare a 500-piece quote with a 5,000-piece quote as if the only difference were material.

A supplier may also charge for a physical proof, a colour drawdown or a new cutting die. Ask which of those charges survive a reorder. A screen archive policy can turn a second order into a much cleaner quote; a supplier that discards the setup makes the buyer pay for the same learning twice.

Which costs scale with every label?

Fibre, adhesive, carrier, ink, machine time, inspection and packing scale with the run. The exact rate depends on the label’s area, pile height and colour count. A 2 cm² single-colour mark consumes less fibre and press time than a 5 cm² four-colour mark, but it may still carry the same cutting and bagging labour.

I would not accept a quote that gives one blended “unit price” without a quantity break. A blended number hides whether the supplier is recovering setup, material or freight. A line-by-line quote lets the buyer challenge the right cost instead of negotiating the whole number blindly.

How Does Screen Setup Hit a Small Run?

Setup becomes painful below roughly 1,000 pieces because a fixed charge is spread over fewer labels. If a screen set costs 120 currency units and the run is 500 pieces, the arithmetic is 0.24 per label; at 2,000 pieces it is 0.06.

Those figures are a worked example, not a market price. If 1 screen set is 120, moving from 500 to 1,000 pieces halves the setup contribution; 2,000 halves it again. Material and machine time do not behave the same way, which is why the total unit price does not fall in a straight line. My rule is to compare 2 adjacent quantities and keep every other input fixed.

Illustrative setup charge500 pieces1,000 pieces2,000 pieces5,000 pieces
600.120.060.030.012
1200.240.120.060.024
2400.480.240.120.048

The table is arithmetic only: setup divided by quantity. It is useful for seeing the slope, not for predicting a supplier’s actual screen fee.

Why does a second colour change the setup line?

A second colour needs another screen, another alignment and another pass through the press. The supplier may also need a second proof and a longer first-off check. The added cost is not only the screen itself; it is the labour required to make the second layer land on the first.

When a buyer asks for “one more colour,” I translate that into production terms: 1 extra screen, 1 extra registration decision and 1 extra chance of a hold at first-off. The price should reflect that work. If it does not, the supplier is either absorbing risk or has not understood the artwork.

How do you amortise setup without guessing?

Ask for the setup line separately and divide it by the quantity under review. Then compare the result with the material and labour line. That calculation tells you whether a smaller run is expensive because of setup or because the supplier is charging a low-volume premium.

My rule is to compare 2 quantities at a time, not 5. A 1,000-piece and 2,000-piece quote show whether the break is real. A 500-piece quote may be below the product’s stated MOQ, so it is useful only as a diagnostic, not as a purchasing plan.

When is a short pilot still worth it?

A short pilot is worth it when the label is strategically new, the fabric is untested or the artwork has a high-cost failure mode. It is less defensible when the design is a simple recolour of an approved mark. I would spend the premium on a press trial and a wash check before spending it on a tiny run of a design nobody has pressed.

How Does Flock Area Change the Variable Cost?

Flock area raises fibre consumption, adhesive coverage, carrier use and press time, so a 5 cm² label is not priced as 2.5 times a 2 cm² label by material alone. The cut shape and waste margin also matter.

A rectangular 2 cm² mark uses a predictable carrier footprint. A 5 cm² shape with a narrow neck may need extra carrier and a slower cut. A 1 cm² logo and a 10 cm² crest can sit on the same garment program yet require different machine time. This is why I compare 2 or 3 sizes before approving a price reduction.

Why does area cost more than fibre weight alone?

The factory does not buy only fibre. It buys coated carrier, adhesive, ink, release film, labour and machine time. A larger flock field may require more electrostatic dwell, more cure energy and more careful handling before the part is packed. The material invoice is only 1 line of the job.

A 0.8 mm profile and a 1.5 mm profile can share a footprint but not the same process window. The taller build uses more fibre and may need a different cure or press recipe. A quote that treats every Tatami label as the same “3D” construction is not specific enough to compare.

Should a brand shrink a logo to hit a price?

Shrinking is rational when the mark remains legible and the placement still has visual weight. It is a bad trade when the reduction turns a 3 mm counter into a dot or forces the registration window below what the supplier can hold. I would rather change the number of colours or simplify the shape than shrink a detail that carries the brand.

Why Does Colour Count Cost More Than Ink?

Each overprint colour adds 1 screen, 1 registration pass and 1 more opportunity to reject a piece for misalignment. The ink cost is often the smallest part of that increase.

The first colour establishes the visual field. The second colour creates contrast. The third and later colours can make a crest look rich, but they also multiply the decisions at first-off. A 4-colour job has more setup, more proofing and more inspection than a 2-colour job even when the labels are the same size.

What does each extra pass consume?

It consumes screen preparation, machine occupancy, operator attention and a registration check. It may also consume extra energy for cure and extra handling between stations. The supplier’s capacity matters: a small order with 6 colours can block a press for longer than a larger order with 1 colour.

The buyer should ask which colours are essential and which are decorative. A subtle shadow created by a sixth screen may cost more than it adds. A strong 3-colour crest often reads better at retail distance than a busy 6-colour mark.

Which colour sequence raises reject risk?

High-contrast neighbours raise the visible risk. White next to black, red next to white, and metallic-looking accents next to matte fields all make a 0.2 mm shift easier to see. Large dark fields also reveal pinholes and fibre disturbance. A supplier should be able to explain which of the 4 passes is most likely to drift. I would ask for that answer in writing before I approve the artwork.

The design consequence belongs in the multicolour registration guide linked above. For pricing, the rule is simple: count the passes, not just the Pantone chips. Every pass has a setup and a yield consequence.

When should a brand simplify the palette?

Simplify when the extra colours do not change the read at 1 m, when the label is smaller than 3 cm across, or when the supplier needs more than 2 sample rounds to make the edge clean. A simpler palette can improve both price and consistency.

How Do Base Material and Backing Change the Quote?

The base and backing determine adhesive choice, press compatibility and validation work; the product page specifies a 0.8–1.5 mm build with a high-stretch backing and polyurethane hot-melt adhesive. Those layers are not interchangeable with every cheap flock sheet.

A backing that works on cotton may not work on a 4-way stretch jersey. A standard adhesive may bond initially and fail after repeated washing. A dyed polyester fabric may need an anti-migration layer to protect pale colours. Each added requirement changes the material stack and the validation work.

Which base choices are standard?

The buyer should ask for the actual construction in writing: face fibre, backing polymer, adhesive chemistry and any barrier layer. “Flock label” is not a complete specification. The same visual sample can be built from different materials with different wash and hand-feel outcomes.

For EU programs, material documentation may also be part of the quote. OEKO-TEX Standard 100 is a useful reference for textile articles, but the certificate scope must match the actual material and supplier. Certification work has a cost, and a credible quote should say whether it is included.

Why can a cheaper base raise the total cost?

A cheaper base can save a few percent on material and lose far more in reject rate, press rework or a failed wash test. If the supplier has to remake 5% of a 2,000-piece run, the saving disappears. If the failure reaches the retailer, the cost moves from the trim invoice to the garment recall.

I would not accept a base substitution after sample approval without a new press trial. The label is a bonded assembly; changing 1 layer changes the whole risk profile.

How Should Volume Be Compared Without Chasing a False Unit Price?

Compare at least 2 quantities above the 1,000-piece MOQ and keep the artwork, fabric and finishing identical. Otherwise the unit price is measuring a different product, not a volume benefit.

The product page gives 4–7 days for sampling and 10–15 days for bulk. A quote that is 10% cheaper but adds 2 weeks to the schedule may be more expensive for a seasonal launch. The correct comparison includes cash cost, calendar risk and the cost of a second sample round.

What changes between 1,000 and 2,000 pieces?

Setup contributes less per label, machine occupancy is more efficient and material purchasing may improve. The unit price should move, but not necessarily by a dramatic amount. Ask the supplier which line changed: setup, material, labour or freight.

If the unit price is identical at both quantities, the buyer should ask why the setup is not being amortised. If the price drops by an implausible amount, ask whether the material or inspection standard changed. A quote is only comparable when the construction is held constant.

Why does a reorder quote drop?

A reorder can reuse screens, artwork, cutting data and an approved sample. The supplier still incurs material, labour, packing and inspection, but the learning cost is lower. A good supplier records the setup and gives the buyer the benefit of that repeatability.

I ask for a reorder assumption in writing before the first order. It protects both sides from a later argument about whether the screens still exist.

When does freight outweigh the unit saving?

Freight can outweigh a small unit saving when the order is light, the delivery window is short or the packaging is bulky. Compare the delivered cost, not the ex-works price. A 0.05 per-label saving on 1,000 labels is 50; a faster freight lane can erase it in 1 invoice.

Which Risk Costs Never Appear on the Unit Price?

Sampling, first-off inspection, wash evidence and rework are risk costs that are easy to omit and expensive to discover after bulk. The product page claims 50+ heavy-duty cycles, so the evidence deserves a budget line.

A supplier may include 1 sample in the quote and charge for additional rounds. It may include a visual inspection but not a wash test. It may replace a failed first-off at no charge but leave the buyer paying for the schedule loss. Those are different commercial offers even when the unit price looks the same.

Risk eventRun sizeUnits exposedCommercial consequence
1 extra sample round1 sample1 proof1 schedule slot
First-off rejection at 3%1,00030 labels1 rework cycle
Bulk failure at 5%2,000100 labels2 replacement cartons
Repeat test on 2 fabrics2 coupons2 reports1 extra approval day

What does a mis-pressed sample cost later?

It can cost a new sample, a new press trial and a delayed bulk start. If the fault is found after 2,000 labels are applied, it can cost rework labour, replacement labels and a retail delivery penalty. The label’s invoice is small compared with the garment’s calendar.

I would budget for 1 physical sample on the actual fabric and 1 repeat only if the first sample exposes a real uncertainty. I would not budget for 5 rounds of hope. My approval sheet records 3 decisions: press, registration and wash.

Which test is cheaper than a rework loop?

A controlled wash or pull-off check on the proposed construction is cheaper than a bulk rework loop. AATCC TM61 is one laundering method a buyer may see in a report; the report must still state the variant, cycle count, fabric and result. A standard name alone is not evidence.

The full evidence checklist belongs in what a flock label test report must prove. The pricing lesson is to put that check before the bulk deposit, where it can still change the construction.

How should approval cost be budgeted?

Budget for the sample, the courier, the internal approval time and 1 realistic test. If the label is going onto a high-value garment, add the cost of a backup material or a second supplier. That is not pessimism; it is the price of a schedule that survives a failed first sample.

How Do Woven, Printed and Silicone Labels Change the Price Logic?

Woven pays for weaving, printed pays for flat ink, silicone pays for tooling, and Tatami flock pays for screens, pile and registration. The cheapest of these 4 options is the one that fits the garment’s job.

OptionMain cost driverBest-fit briefCost risk to watch
3D Tatami flockScreens, area, colours, backingSoft raised multicolour brandingRegistration and press compatibility
Woven damaskLoom setup, weave, sewingFine flat detail and sewn-in permanenceSampling and attachment time
Printed labelFlat stock and print setupSimple, cost-led flat brandingLower tactile value
Silicone patchTooling and moldingHard tactile shell and molded depthTooling amortisation

When is woven cheaper at scale?

Woven can be cheaper at high volume when the design is flat, the label is sewn into a seam and the buyer does not need a raised multicolour surface. The loom setup has its own economics, but the attachment cost and material yield are different. Compare delivered cost and lead time, not a single unit number.

When does printed undercut the flocked option?

Printed usually undercuts a flocked construction when the design is flat, the colour count is modest and the buyer accepts a less tactile surface. It is the rational choice for a care label or a simple internal mark. It is not a like-for-like substitute for a raised brand badge.

When is silicone worth its tooling?

Silicone is worth the tooling when the product needs a molded shell, a harder edge or a technical look that a flock surface cannot provide. The tooling cost must be amortised over the order and any planned reorders. If the design is likely to change every season, a lower-tooling process may be the better commercial choice.

The material trade belongs in where woven, printed or silicone wins instead. The cost rule is to compare the full assembly, not the face material alone.

How Should You Read a 3D Tatami Flock Label Quote Line by Line?

A useful quote separates 7 lines: artwork and screens, flock material, base and adhesive, press time, finishing, inspection and freight. A single blended price makes the buyer negotiate in the dark.

I start with the setup line because it is the easiest to verify. Then I check whether the area and colour count match the actual artwork. Next I compare the base and backing with the approved sample. Finally I read the exclusions, because the cheapest quote often excludes the work that protects the delivery date. I compare 3 quotes at 2 quantities, keep 1 golden sample and 2 photos, and reject any quote that names 0 materials or 0 inspection rules. My rule is 3 quotes, 2 quantities, 1 fabric, 1 deadline and 1 approved sample. I keep 1 signed comparison sheet and my decision note with the quote.

Quote lineWhat I verify
1. Artwork and prepressFile version and colour separations
2. ScreensCharge per colour and reorder policy
3. Flock and adhesiveArea, profile and backing
4. Press timeColour count and run quantity
5. FinishingCutting, bags and carton labels
6. InspectionSampling plan and wash evidence
7. FreightIncoterm, lane and delivery date

Which questions expose a fixed charge?

Ask whether the screen, proof, cutting die and first-off alignment are charged once or per run. Ask what happens on a reorder and whether the setup is archived. Ask whether a colour change after approval creates a new screen or only a new ink mix.

What must be excluded from a like-for-like comparison?

Do not compare a quote with no sampling against one with 2 samples, or a quote with standard inspection against one with a wash report. Do not compare a 1,000-piece quote with a 500-piece exception, or a domestic freight lane with an air shipment. Put the same scope on both sides before looking at the total.

Which line item should be challenged first?

Challenge the setup and the colour count first, then the finishing and freight. Material is often the least negotiable line because the construction must remain stable. A buyer who attacks the fibre cost without changing the construction may win a small discount and lose the sample’s performance.

When to Choose 3D Tatami Flock Labels—and When Not To

Choose 3D Tatami Flock Labels when a raised multicolour surface earns the setup and 1,000-piece MOQ. Use printed for a cost-led flat mark, woven for sewn-in detail, and silicone for a molded shell.

The clean-fit order has stable artwork, a compatible fabric, a realistic 10–15 day bulk window and a buyer who will approve a physical sample. The poor-fit order has unresolved artwork, an untested stretch shell and a target price below the cost of the first-off check. I would walk away from the second brief before it becomes a rework conversation.

Which order profile fits?

A fit profile has 1 to 4 colours, a readable mark, a fabric swatch and a quantity at or above 1,000. It can absorb 4–7 days for a sample and another 10–15 days for bulk. The brand knows which label surface it wants and is willing to freeze the artwork. I would ask for 1 reorder forecast before the first screen is made.

Which order should stop?

Stop when the artwork is still changing after the screen quote, when the buyer refuses a physical sample, or when the only comparison is a unit price from a different construction. A cheap quote cannot fix a brief that has no decision. I would rather lose 1 order than carry 1,000 unusable labels.

What do you send for a firm quote?

Send the vector artwork, finished size, colour count, fabric composition, placement, quantity and required delivery date. Add any wash, migration or certification requirement. With those inputs, a supplier can quote the real construction instead of a placeholder.

Watch the finished 0.8–1.5 mm flock surface in motion, then compare it with the 1,000-piece MOQ, 4–7 day sample and 10–15 day bulk path in the quote.

Which setup charge changes when I add a second colour?

A second colour usually adds a screen, a proof and a registration pass. The supplier may also need more first-off time and a different cure sequence. Ask for the setup line separately from material and labour. If the extra colour does not change the unit price or the setup fee, ask the supplier to explain what work the colour requires.

How does label area change a Tatami flock quote?

Area changes fibre, adhesive, carrier, ink, press time and cutting waste. A 5 cm² label is not priced as 2.5 times a 2 cm² label by material alone because handling and registration do not scale down. Ask whether the quote uses the finished label area or the full carrier footprint, since the difference can be material on a narrow shape.

What does a reorder save compared with a new design?

A reorder can reuse screens, artwork, cutting data and the approved sample, so the learning and setup work should be lower. Material, labour, packing and inspection remain. Ask in writing whether the screens are archived and which setup charges repeat. That answer is more useful than a verbal promise of a future discount.

When should I avoid paying for a multicolour Tatami flock sample?

Avoid paying for a multicolour sample when the artwork is still changing, the fabric is unknown or the brand has not chosen a target quantity. A sample cannot resolve those decisions. Fix the brief first. Spend the sample budget on 1 test that answers a real production question, not on a beauty shot for an internal presentation.

Does a smaller label always lower the landed cost?

No. A 1 cm² label can cost more per square centimetre than a 5 cm² label because handling, registration and packing do not shrink with area. A narrow shape can also waste carrier. Compare the delivered cost for the actual cut shape, quantity and finishing, not only the surface area.

Dave Li - Founder and Lead Product Manager

About the Author: Dave Li

With over 30 years of hands-on apparel accessories manufacturing experience, Dave Li is the Founder and Lead Product Manager at Chief Labels. He writes to cut through the industry’s “eco-BS”, helping brands engineer trims that actually work on the assembly line without destroying their margins.


🚀 Ready to source 3D Tatami Flock Labels?

Visit our 3D Tatami Flock Labels page for detailed specifications, pricing tiers, and to request a custom quote for your production run.

Get a Quote for 3D Tatami Flock Labels
Scroll to Top